ReGlasgow

MILESTONE For Massive Candleriggs Development

31 May, 2023 | Major Developments

THE £300million Candleriggs Square development in Glasgow’s Merchant City has reached another significant milestone with the completion of structural work for a major apartment build-to-rent (BTR) complex.

Candleriggs Development 2 Limited — the joint venture between Drum Property Group and Stamford Property Investments — agreed a deal with Legal & General Investment Management Real Assets in 2020 to bring the £81.5 million apartment complex to the 3.6-acre site.

Designed to meet the growing post-lockdown demand for affordable and high-quality city centre rental accommodation in city centre locations, the 325,000 sq. ft building will provide 346 apartments together with a range of retail and commercial units at ground floor level and attractive and accessible public realm.

A generous entrance lobby will open on to Glasgow’s Trongate, giving direct access to a communal landscaped courtyard at first-floor level, while a range of roof terraces will provide spectacular views across the city.

Also currently under construction is a 500-room hotel and leisure complex owned and operated by the pioneering hotel brand The Social Hub — formerly known as The Student Hotel Group — which is due for completion later this year.

Senior representatives from Drum, Legal & General and building contractor Graham Construction gathered to mark the traditional topping out ceremony, each recording their signatures on the last concrete pour on the highest part of the building.

Graeme Bone, left, and Dan Batterton

Graeme Bone, managing director of Drum Property Group, welcomed the building’s structural completion as marking an exciting future for the city centre.

He said: “Our significant progress at Candleriggs Square is fast becoming a highly visible symbol of the regeneration of Glasgow’s Merchant City and the city centre as it continues its post-lockdown recovery.

“The L&G development is testament to the commitment and confidence we have placed in both the Candleriggs Square site and Glasgow city centre during very challenging times for our industry.

“It represents a significant step forward in the long-awaited regeneration of one of Glasgow’s most prominent gap sites, driving forward the evolution of Candleriggs Square which has quickly established itself as one of Scotland’s largest and most important commercial and residential development sites.

“This will be a huge boost to the area and to local businesses and we can now look forward to bringing back to life a very special area which has always been at the centre of Glasgow’s commercial and social development.”

Dan Batterton, head of residential at Legal & General Investment Management Real Assets, added: “We are proud to be working again with Drum following our successful partnership on the Solasta Riverside scheme at Buchanan Wharf.

“Through our development at Candleriggs Square, we are providing renters with an opportunity to move into a well-designed, flexible living space at the heart of the city, as well as supporting the local council’s target of 2,500 new homes per year over the next decade.”

Candleriggs Square website

Pin It on Pinterest