ReGlasgow

IN Pictures — Work Progressing On Tradeston’s Historic Beco Building

2 September, 2021 | Listed / Historic Buildings, In Pictures

THE scaffolding has come off following the first stage of improvements at the B-listed Beco building as part of the new Barclays campus.

A view of the building in 2018
Image of how the development is expected to look

The Tradeston landmark will house a Barclays’ Eagle Lab and branch in the lower floors with flexible and creative workspace for Barclays at upper levels.

Repairs have been carried out to make the Beco building wind and watertight.

Full details in previous story

Pin It on Pinterest